Print Page  Close Window

SEC Filings

S-1/A
CHARTER COMMUNICATIONS, INC. /MO/ filed this Form S-1/A on 11/01/1999
Entire Document
 
<PAGE>   106
 
     THIRD PARTIES.   We also rely directly and indirectly, in the regular
course of business, on the proper operation and compatibility of third party
systems. The year 2000 problem could cause these systems to fail, err, or become
incompatible with our systems.
 
     If we or a significant third party on which we rely fails to become year
2000 ready, or if the year 2000 problem causes our systems to become internally
incompatible or incompatible with such third party systems, our business could
suffer from material disruptions, including the inability to process
transactions, send invoices, accept customer orders or provide customers with
our cable services. We could also face similar disruptions if the year 2000
problem causes general widespread problems or an economic crisis. We cannot now
estimate the extent of these potential disruptions.
 
     STATE OF READINESS.   We are addressing the year 2000 problem with respect
to our internal operations in three stages:
 
   
     (1) conducting an inventory and evaluation of our systems, components, and
         other significant infrastructure to identify those elements that we
         reasonably believe could be expected to be affected by the year 2000
         problems. This stage has been completed;
    
 
   
     (2) remediating or replacing equipment that, based upon such inventory and
         evaluation, we believe may fail to operate properly in the year 2000.
         This stage is substantially complete; and
    
 
   
     (3) testing of the remediation and replacement conducted in stage two. This
         stage is substantially complete.
    
 
   
     Much of our assessment efforts in stage one have involved, and depend on,
inquiries to third party service providers, suppliers and vendors of various
parts or components of our systems. We have obtained certifications from third
party service providers, suppliers and vendors as to the readiness of mission
critical elements and we are in the process of obtaining certifications of
readiness as to non-mission critical elements. Certain of these third parties
that have certified the readiness of their products will not certify their
interoperability within our fully integrated systems. We cannot assure you that
these technologies of third parties, on which we rely, will be year 2000 ready
or timely converted into year 2000 compliant systems compatible with our
systems. Moreover, because a full test of our systems, on an integrated basis,
would require a complete shut down of our operations, it is not practicable to
conduct such testing. However, we have utilized a third party, in cooperation
with other cable operators, to test a "mock-up" of our major billing and plant
components, including pay-per-view systems, as an integrated system. We are
utilizing another third party to conduct comprehensive testing on our
advertising related scheduling and billing systems. In addition, we have
evaluated the potential impact of third party failure and integration failure on
our systems in developing our contingency plans.
    
 
     RISKS AND REASONABLY LIKELY WORST CASE SCENARIOS.   The failure to correct
a material year 2000 problem could result in system failures leading to a
disruption in, or failure of certain normal business activities or operations,
for example, a failure of our major billing systems and plant components such as
our pay-per-view systems. Such
 
                                       103